Planning

Planning is essential to project management and organising work. Contributors are free to make plans however they please or make none at all. However, the root contribution circle uses a specific model in order to document progress and assess the future.

This system helps the root contribution circle in several ways:

  • Principally helps us to explore problems more deeply before working on a solution to a particular problem. As otherwise it is easy to converge on a solution without considering the bigger picture.
  • Keeps work and planning transparent and easy to share with the draupnir longhouse assembly. So it is easy to explain to stakeholders what is being worked on and why.
  • Makes it easier to check that work is implemented correctly and to a high quality.
  • Helps new contributors to onboard as the tasks show them which parts of the project to change.
  • Preserves a record of decisions and history of problem exploration that is well documented.

Problems

After triage issues are consolidated into a "bigger picture" discussion that captures and describes the problem. This is done at as higher level as possible without implementation detail. It is extremely important to refrain from the temptation to describe the problem in a way that precludes it to a specific solution. Keeping the problem abstract gives us the opportunity to consider our options and the trade-offs with each of them. This is strategically significant as without this step, the consideration likely will not happen.

Problems should have the following properties:

  • A list of actors involved.
  • The current workflow for the problem, how does the system already work
  • The problems with this workflow and what commands / prompts / protections are involved in the interaction.
  • A concise high level description of what the actors are attempting to achieve with the current workflow in the absence of implementation detail, commands, prompts, or protections.
  • A specific high level analysis of the problem in the absence of implementation detail.
  • No requirements or language that attempts to form requirements is used at all. This is not the place for requirements engineering. As this risks sneaking solutions into the problem statement

Problems should also record the following:

  • A list of issues that are considered
  • The triage score of those issues
  • A list of solutions that have been explored
  • Possibly an analysis of why a solution failed if exploration brought us back to the problem space.

Solution hypotheses

Once a problem has been described, a solution can be designed. Solutions should have the following properties:

  • An approach for how the problem is going ot be solved.
  • An overview of any planning risks with the approach or any trade-offs.
  • The success criteria with reference to actors.
  • A list of tasks that break down the solution into workable units.

If a line of work makes a discovery that compromises the solution, then a new solution should be created after the problem is updated.

Discovery tasks should be included under solutions that have uncertainty or need refinement.

Solutions should be iterated from feedback experienced from working on tasks.

Deliverable Tasks

Once a solution hypothesis has been designed. The solution needs to be broken down into instructions for work that can be delivered. These tasks are the only planning issue that can be reliably estimated in development cycles with.

Tasks are also used to document any work that has been undertaken.

Tasks should explain very specifically what protections, commands, library code is going to be edited and how.

Tasks can be thought of as "document what you intend to change and work on before you change it". It helps to build a picture of the size of the task without actually committing to or doing much work. They also help contributors less familiar with the project pick up work easily.

Solutions may have one task which is to simply explore the problem space and write up the other tasks. A workload cycle would then simply only include this one task.

Tasks typically include:

  • A high level description of the task.
  • A description of what pieces of software are going to be changed.
  • The acceptance criteria for the task.
  • The details of any work undertaken on the task.

For a concrete problem, Tasks should typically be created for:

  • Implementation how-to for a specific part of a deliverable.
  • Regression test for a piece of functionality.
  • End-user documentation is to be created for a deliverable.
  • Implementation how to for a library change that may be required.
  • Discovery placeholders when library changes have other dependants.
  • Development documentation for new patterns or abstractions.

For a planned problem, Tasks should be created for:

  • Research and planning tasks for deriving or exploring a solution.
  • Refinement placeholders when solutions remain abstract.

Review

Work that is completed should first be reviewed against the solution, and then reviewed against the original problem

Success vs acceptance criteria

Success criteria are related to solutions, they're related to the problem and are always grounded with actors.

Acceptance criteria aren't grounded with actors and are specific to making sure important aspects of the task are complete.

Common actors

Contributor

Someone who contributes to the draupnir project.

Room moderator

A moderator for a room on Matrix.

Homeserver administrator

A moderator managing users resident to a Matrix homeserver, and rooms that the homeserver is joined to.

System administrator

This is someone who is deploying and managing draupnir at a software systems level, rather than someone who necessarily uses it.

Why we do not use story pointing

Story pointing may work in some environments. We used to use it for this project but we have identified some weaknesses:

  • We do not have reliable historical information on completion of other tasks, it's also very difficult to do this if you need to change methodologies.
  • The bigger a story is, the more inaccurate the estimate is going to be, because there is going to be less detail and less consideration with reference to the implementation.

We also became prone to Goodhart's law: "When a measure becomes a target, it ceases to be a good measure". If you note that you work on 20 story points in a week, you'll start scoring things to fit that. It is very difficult to avoid this bias and everyone involved has an interest to score lower or higher.

Using Tasks as the fundamental unit of work means that they are always grounded in the implementation. And there is no estimation of task size required, they're all the same size.